Blower Door Testing

Blower Door Testing is essential to verify air tightness in construction.

Passive House owns and operates a modern Minneapolis Blower Door with full digital pressure set and laptop system software for recording and analysing test results. 

Thomas and Peter Blower Door Testing:

">

 

The New Zealand (Australian?) context of air tightness in buildings:

                      

Ref: Classifications of residential building airtightness (in NZ); Bassett, M.R. 2001

 

A CSIRO report (The Evaluation of the 5-Star Energy Efficiency Standard for Residential Buildings, December 2013), published air-tightness results for 20 houses in Melbourne; with an average result was a massive 19.7 ac/h@50pa (that's a "natural" building infiltration/leakage rate of 1 air change per hour 24/7, all year round)

CSIRO_Air_Infitration_Blower_Door_Test_Melbourne

Note, none of the houses tested met the NatHERS/FirstRate5 ratings premise of 5 ac/h@50pa 

 

The European & North American context of air tightness in buildings:

 

From the ASHRAE Fundamentals Handbook 2013, the following published results:

ASHRAE_Air_Infiltration_Blower_Door_Test